A transparent look at the creation of our first home, from raw land to finished residence.


The Build Journal


Every home tells a story. This journal documents each milestone. From raw land to finished home, with the same transparency and attention to detail that guide every HAVN project.


June 2026

Well Completed

The well has officially been drilled. Another key milestone complete as the Sturbridge home moves closer to construction. One step at a time, we’re bringing the HAVN vision to life


Land

Design

Well Permit


Well Completed

Foundation

Framing

Dry-In

Mechanicals


2025
May 2026

Driveway access was completed and foundation staking finalized. The site is now prepared for the next phase of work.

Well Permit Approved

Site Ready for Construction

The well permit was approved by the Town of Sturbridge. Well drilling is expected to begin shortly.

May 2026


Design & Vision

The vision was to create a modern Scandinavian home designed for simplicity, natural light, and connection.

Thoughtful design, intentional layout, and timeless materials come together to create a space that feels calm, functional, and inspiring.

Simple. Modern. Natural.